The big advantages of timber frame construction (TFC) are fast, prefabricated and a lightweight when it comes to construction works. Those advantages also apply to the E-Board insulation system. The system is completed with brick slips that make it look like real brickwork. Just take a look at the newly completed project for the health centre Duizendblad in Amstelveen (NL).

 

Uniform façade appearance

The E-Board system can be mounted on any substrate. The building in Amstelveen uses both sand-lime blocks and TFC. The EPS E-Board panels are attached on the exterior side and then covered with original brick slips. The insulation system ensures a high insulation value as well as a regular appearance of the façade.
  
E-Board insulation system

Project: Health centre Duizendblad, Amstelveen (NL)
Colours : 096 Brabant, headers in 533 Morvan
Brickwork bonds : Vertical and stretcher bond
Architect : Molenaar&Bol&VanDillen architecten, Vught (NL)

 

TFC on the roof

The third floor has been constructed specially for the technical space on the roof. This additional floor is built in a lightweight TFC. From an architectural viewpoint, it is quite simple to put the technical space on the roof as it makes more useful space available in the rest of the premises. The finishing with E-Board gives this floor exactly the same appearance as the rest of the building. Using E-Board gives TFC even more benefits. The foil that is usually needed is no longer required because the high-value EPS material is both breathable and water repellent.

 
E-Board insulation system E-Board insulation system



Brilliant brickwork

E-Board insulation system

The pattern of stretchers and headers can be seen in the large areas, where the headers are fired in a different colour. Another pattern is also available in relief. The brick slips are supplied in thicknesses of 20 mm and 35 mm. This enables one to create a relief wall easily without labour-intensive bricklaying work.

Further to the TFC

A high insulation value often means a high cost and reduced interior space. Additional layers of insulation are no longer needed in TFC when combined with E-Board. The contractor is able to find the ideal combination of timber frame and E-Board insulation boards, which are up to 204 mm thick for a single panel of insulation. As it happens, E-Board in the minimum thickness of 60 mm ensures that the slight tensions in the timber construction remain firmly beneath the insulation layer. All this improves the quality of the exterior façade.

 
 
Project details:

Project: Health centre Duizendblad, Amstelveen (NL)
Colours: 096 Brabant headers in 533 Morvan
Brickwork bonds: Vertical and stretcher bond
Architect: Molenaar&Bol&VanDillen architecten, Vught (NL)
Contractor: Construction contractors De Heemraad, Amstelveen (NL)
Supplier: Raab Karcher


ProjectsColoursTechnical informationInformation request
     


Contact us

Request the complete architect's folder by e-mail from: info@vandersanden.com or call us on +32 89 51 01 40. You can also find our projects’ portfolio at www.vandersandengroup.com.

VanderSandeGroup




 
Look in the Building corner
Are you looking for a building product?
Write hereunder the keyword.

Keyword
Headlines
24-04 Announcement nominees European Architecture Awards 2017
13-04 Quartéis de Santa Justa
10-04 Huge success for the European Architecture Awards, 327 projects coming from 32 countries
10-04 Huge success for the European Architecture Awards, 327 projects coming from 32 countries
22-03 UniCredit Pavilion in Milan – lighting as a component of outstanding architecture
21-03 IKC Zalmplaat - Primary school in a characteristic and epressibe building
20-03 THE MIPIM AWARDS 2017 WINNERS
13-03 Vittorio Simoni - Simoni Architecten, Hasselt
08-03 Black Box Gym - A Temporary Architecture Practice
06-03 A 'City for All' - UNStudio
27-02 Moreelsebrug Utrecht
20-02 HHF Wins Competition for Tower Building in Biel
17-02 Marc Younan architecture office converted an industrial building into 85 social housing units
15-02 Organic Farm
08-02 Brede School Aarle-Rixtel, Laarbeek - Holland
30-01 European Architecture Awards 2017 : international competition for architects
25-01 INAUGURATION OF RENEWED THIALF ICE ARENA BY KING WILLEM-ALEXANDER
20-01 Awarding Ceremony Archi-World® Academy III edition 2017
18-01 Winning projects Archi-World® Academy Awards 2015-2017
Agenda
Learning from Japan (> 24/09/2017) - Copenhagen Designmuseum Danmark
SPACE IN MOTION: A Century of Estonian Architecture (> 31/12/2017) Tallinn Museum of Estonian Architecture
Decades of Finnish Architecture 1900–1970
(27/03/2010 – 31/12/2020)
All contests
Downloads
Archi-News printed 01/2017 EN/FR
Archi-News printed 2016 EN/FR
Archi-News printed 01/2015 EN/FR
Archi-News printed 02/2015 EN/FR
Archi-News Printed 01/2014 EN/FR
Archi-News Printed 02/2014 EN/FR
Archi-World® Academy Guide 2013-2015
Archi-News Printed 02/2013 EN/FR
Archi-News Printed 01/2013 EN/FR
Archi-News Printed 01/2012 EN/FR
Archi-News Printed 2/2011 EN/FR
Archi-Europe Group Brochure edition 2012
Archi-World® Academy Guide
Archi-News Printed 1/2011 EN/FR
Archi-News Printed 2/2010 EN
Archi-News Printed 2/2010 RU
Archi-News Printed 1/2010
Archi-News Printed 2009
Affiche Archi-Bau-Awards 2009
Archi-News Printed 02/2008
Archi-News Printed 01/2008
Archi-News Printed 10/2007
Archi-News Printed 04/2007
Archi-News Printed 01/2007
Archi-Europe Group Brochure
Archi-News Printed 09/2006

Archi-Europe Archi-Europe Group Links

Premium partner

Institutional Partners

International Exhibitions & Events

                                             

Media Partners

                              
Partners
               
designed by infoweb